Please note, all charges are GST inclusive unless indicated otherwise.
Services Consents - Connection/Disconnection - all locations
Description | 2023/24 (GST incl.) |
---|---|
Application Fee | $550.00 |
Inspection / Re-inspection fee for non-compliant works or missing information (per inspection) | $275.00 |
Charge for works that are not remedied after non-compliant inspection | Monthly Fee per site - $100.00 |
Connection / Disconnection (Physical Works)
Description | 2023/24 (GST incl.) |
---|---|
All pipe sizes and manholes - all locations | Actual Cost |
Trade Waste Charges
Description | 2023/24 (GST incl.) |
---|---|
Fixed costs - per cubic metre of consented median discharge volume per day | $0.78 |
Variable costs - per cubic metre of discharge (invoiced after 1 July irrespective of time period covered) | $0.14 |
Inspection (per visit) | $275.00 |
Special Liquid Waste Charges
Description | 2023/24 (GST incl.) |
---|---|
Disposal charge (per cubic metre) | $10.50 |
Additional charge for high solids content (per cubic metre) - Dependant on solids content - Minimum charge 1 cubic metre. | $190.00 |
Solid waste requiring landfill disposal (per tonne) | $350.00 |
Last updated: 30 Jun 2023