Sewer Fees

Fees & charges

Please note, all charges are GST inclusive unless indicated otherwise.

Services Consents - Connection/Disconnection - all locations

Description2023/24 (GST incl.)
Application Fee $550.00
Inspection / Re-inspection fee for non-compliant works or missing information (per inspection) $275.00
Charge for works that are not remedied after non-compliant inspectionMonthly Fee per site - $100.00

Connection / Disconnection (Physical Works)

Description2023/24 (GST incl.)
All pipe sizes and manholes - all locations Actual Cost

Trade Waste Charges

Description2023/24 (GST incl.)
Fixed costs - per cubic metre of consented median discharge volume per day $0.78
Variable costs - per cubic metre of discharge (invoiced after 1 July irrespective of time period covered) $0.14
Inspection (per visit) $275.00

Special Liquid Waste Charges

Description2023/24 (GST incl.)
Disposal charge (per cubic metre) $10.50
Additional charge for high solids content (per cubic metre) - Dependant on solids content - Minimum
charge 1 cubic metre.
$190.00
Solid waste requiring landfill disposal (per tonne) $350.00

Last updated: 30 Jun 2023