Wastewater Fees

Fees & charges

Please note, all charges are GST inclusive unless indicated otherwise.

Sections 12 and 150 of the Local Government Act 2002.

Services Consents - Connection/Disconnection - all locations

Description2026/27 (GST incl.)
Application Fee $750.00
Inspection / Re-inspection fee for non-compliant works or missing information (per inspection) $410.00
Charge for works that are not remedied after non-compliant inspectionMonthly Fee per site - $300.00
New Connection - Wastewater Infrastructure$3,093.00

Connection / Disconnection (Physical Works)

Description2026/27 (GST incl.)
All pipe sizes and manholes - all locations Actual Cost +10% admin fee

Trade Waste Charges

Description2026/27 (GST incl.)
Fixed costs - per cubic metre of consented median discharge volume per day $1.056
Variable costs - per cubic metre of discharge (invoiced after 1 July irrespective of time period covered) $0.183
Non-routine unscheduled Inspection or Investigation (per visit) $355.00 + actual costs (e.g. lab fees) + 10% admin fee

Special Liquid Waste Charges

Description2026/27 (GST incl.)
Disposal charge (per cubic metre) $17.30
Additional charge for high solids content (per cubic metre) - Dependant on solids content - Minimum charge 1 cubic metre.
$275.00
Solid waste requiring landfill disposal (per tonne) $495.00
 ($200.00 minimum charge)
Permitted connection* annual charge
*Permitted connection being a trade waste permit holder that is not metered or subject to an individual Agreement
$275.00

Other Fees

Description2026/27 (GST incl.)
Regularising unauthorised connection to sewer (obtaining retrospective consent) Actual cost + 10% admin fee

Note - refer to ‘Staff Time, Research and Information Services Charges’ for staff hourly rates.

Last updated: 01 Jul 2026